New Hudson Valley

Building a Passive House in Columbia County

New Hudson Valley

Main menu

Skip to primary content
Skip to secondary content
  • Home
  • About
  • Passive House

Tag Archives: concrete

Post navigation

Newer posts →

Frost wall is insulated and backfilled

Posted on April 24, 2012 by admin

The footing and South end frost wall have been brought up to level, ready for the foundation walls.

Posted in 1. DIG TO DECK, 3. Insulation | Tagged concrete, footing, foundation, rigid foam

Raising the frost wall

Posted on April 17, 2012 by admin

Sliding glass doors will allow us to walk out of the lower level (after a lot more excavation to the South). Extra deep footings are required to get below the excavated entrance.

Posted in 1. DIG TO DECK | Tagged concrete, construction, foundation

Our new footing after the pour

Posted on April 14, 2012 by admin

Posted in 1. DIG TO DECK | Tagged concrete, construction, footing, foundation, XPS

Filling the forms

Posted on April 14, 2012 by admin

Posted in 1. DIG TO DECK, Chris Gould Photographs | Tagged concrete, construction, footing, foundation

The pour begins

Posted on April 14, 2012 by admin

The site surrounding the excavation was prepared so that the concrete truck could drive around the edge of the excavation throughout the pour.

Posted in 1. DIG TO DECK, 3. Insulation, Chris Gould Photographs | Tagged concrete, construction, footing, foundation, foundation pour

The first cement truck arrives

Posted on April 14, 2012 by admin

Posted in 1. DIG TO DECK, Chris Gould Photographs | Tagged concrete, concrete truck, construction, foundation, foundation pour

Post navigation

Newer posts →

Energy-efficient by design

BarlisWedlick

Designed by BarlisWedlick Architects, Built by Bill Stratton Building Company, Interior & Finishing by Chris Gould

Contents

  • BUILDING A PASSIVE HOUSE (218)
    • 1. DIG TO DECK (47)
      • Deck (9)
      • Excavation (5)
      • Foundation (11)
      • Vapor Barrier (2)
    • 2. Exterior Shell (77)
      • Framing – Glulams (13)
      • Porches (9)
      • Roof (11)
      • SIPs (19)
      • Windows (12)
    • 3. Insulation (26)
    • 4. Interior (56)
      • Bathrooms (3)
      • Bedrooms (6)
      • Kitchen (7)
      • Living Areas (13)
      • Mechanicals (16)
        • HRV (6)
      • Stairs, Railings and Trim (8)
      • Taping and sealing (2)
    • 5. Site Development (28)
      • Driveway (4)
      • Electrical Service (9)
      • Septic System (7)
      • Well (2)
    • 6. Architecture and Inspiration (23)
      • DWA (12)
    • Certification (5)
    • Media (9)
    • Passive House People (9)
  • Chris Gould Photographs (62)
  • DIY – Do It Yourself (26)
  • Friends and Family (35)
  • Uncategorized (15)

Administration

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Proudly powered by WordPress