Furring out the inside

Posted on October 16, 2012 by admin

To avoid putting holes in the airtight Passive House shell, our electrical fixtures will be attached to the inside of the structural insulated panels (SIPs). Drywall will be screwed onto these two-inch thick furring strips, leaving a gap under the drywall for switch boxes and electrical conduit.

Posted in 2. Exterior Shell, Framing - Glulams, SIPs | Tagged electrical, furring strips

Preparing our window openings

Posted on August 1, 2012 by admin

Posted in 3. Insulation, Chris Gould Photographs, Framing - Glulams | Tagged insulation, Intus windows, Spray foam insulation, windows

Second floor framing

Posted on July 28, 2012 by admin

Posted in 4. Interior, Chris Gould Photographs, Deck, Framing - Glulams | Tagged Floor framing, Foundation and Deck, Framing, I-beams, LVL

Raining outside, framing inside

Posted on July 28, 2012 by admin

Posted in 4. Interior, Chris Gould Photographs, Framing - Glulams | Tagged Framing, I-beam, Interior framing, LVL

Building the South end window frame

Posted on July 26, 2012 by admin

The rough opening for the four Intus windows that will frame our Southern exposure.

Posted in Chris Gould Photographs, Framing - Glulams, Windows | Tagged Framing, Intus windows, windows

West side brackets

Posted on July 24, 2012 by admin

Posted in Chris Gould Photographs, Framing - Glulams, Roof | Tagged architectural detail, brackets, roof, roof extension

Roof extensions

Posted on July 23, 2012 by admin

Posted in 2. Exterior Shell, Chris Gould Photographs, Framing - Glulams, Roof | Tagged brackets, Exterior, Framing, roof, Roof extensions

Completing a cathedral in the morning

Posted on June 28, 2012 by admin

With careful preparation and staging the day before, the final two of five glulams are set in place first thing in the morning. By 9 am we have a cathedral in the field.

Posted in 2. Exterior Shell, Framing - Glulams

Raising more beams

Posted on June 27, 2012 by admin

Posted in 2. Exterior Shell, Framing - Glulams

Raising the first glulam: June 26th

Posted on June 26, 2012 by admin

June 26, 2012. The team from Bill Stratton Building raised the first beam today. We were as excited as the children, walking under and around and contemplating this new dimensionality. Susan’s parents came over to see the progress. Today is Sally (Requa) Guthridge’s 73rd birthday.

Posted in Chris Gould Photographs, Framing - Glulams

Post navigation

← Older posts

Energy-efficient by design

BarlisWedlick

Designed by BarlisWedlick Architects, Built by Bill Stratton Building Company, Interior & Finishing by Chris Gould

Contents

  • BUILDING A PASSIVE HOUSE (218)
    • 1. DIG TO DECK (47)
      • Deck (9)
      • Excavation (5)
      • Foundation (11)
      • Vapor Barrier (2)
    • 2. Exterior Shell (77)
      • Framing – Glulams (13)
      • Porches (9)
      • Roof (11)
      • SIPs (19)
      • Windows (12)
    • 3. Insulation (26)
    • 4. Interior (56)
      • Bathrooms (3)
      • Bedrooms (6)
      • Kitchen (7)
      • Living Areas (13)
      • Mechanicals (16)
        • HRV (6)
      • Stairs, Railings and Trim (8)
      • Taping and sealing (2)
    • 5. Site Development (28)
      • Driveway (4)
      • Electrical Service (9)
      • Septic System (7)
      • Well (2)
    • 6. Architecture and Inspiration (23)
      • DWA (12)
    • Certification (5)
    • Media (9)
    • Passive House People (9)
  • Chris Gould Photographs (62)
  • DIY – Do It Yourself (26)
  • Friends and Family (35)
  • Uncategorized (15)

Administration

  • Register
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Proudly powered by WordPress