New Hudson Valley

Building a Passive House in Columbia County

New Hudson Valley

Main menu

Skip to primary content
  • Home
  • About
  • Passive House

Post navigation

← Previous Next →

Raising the frost wall

Posted on April 17, 2012 by admin

Sliding glass doors will allow us to walk out of the lower level (after a lot more excavation to the South). Extra deep footings are required to get below the excavated entrance.

Share this:

  • Facebook
  • X
This entry was posted in 1. DIG TO DECK and tagged concrete, construction, foundation by admin. Bookmark the permalink.
Proudly powered by WordPress