Attaching Neopor insulation blocks to the foundation exterior

Neopor insulation blocks are fitted and screwed onto furring strips. After the attachment , gaps will be filled with expanding foam insulation. The application of these blocks will complete the envelope of insulation running under the slab and footing, then up the exterior of the poured concrete foundation. The foundation and slab are completely insulated from ground contact and thermal bridging.

Pouring the slab

Rain has caused delay. The slab is poured at the first opportunity of clear weather.4” of concrete poured on 10″ of EPS foam.Dan Gregg brought in extra hands for the slab pour.Dan and Rich from Dan Gregg foundations.Clearing our in-floor electrical outlet.Slab finishing.Edge polishing.Dan Gregg spent the day polishing the floor. The finished slab with expansion joints cut in place.The rain returned at the end of the day.